top of page
Main Earth Testing
An example of some parameters inspected but not limited to:
-
Testing of main earthing resistance and record results.
-
Earth testing will be carried out on the main earthing system within the main switchboard and at the main earth electrode.
-
Test all connections for continuity and resistance.
-
Measure leakage current in the main neutral and earthing system.
-
Any additions or changes checked to ensure they are adequately connected to the lightning protection system.
bottom of page